Takt time calculator

Takt time is the pace your customer sets: available working time divided by demand. Enter the demand and your working pattern to get takt, then add your processes to see which ones can keep up — counting stoppages and rework, not just the stopwatch time.

1 · Customer demand

2 · Working time

h
min

For the pitch (optional)

Planned working time only. Leave out overtime: it's a symptom, not available time.

3 · Your processes (optional)

Cycle time from the stopwatch, not the standard. Uptime and first-pass yield turn it into the effective cycle time that has to fit inside takt.

s
%
%
s
%
%
s
%
%
s
%
%

Takt time

90 s

The customer takes one piece every 90 s. Every process has to keep up with that, on average, over the working day.

Daily demand
600 pcs
12 000 ÷ 20 working days
Available time a day
54 000 s
2 × (8 h − 30 min)
Pitch
30 min
20 × takt
People needed
2.8
250 s of work ÷ takt

Each process against takt

  • Cutting39.1 s · 43% of takt
  • Forming77.6 s · 86% of takt
  • Welding98 s · 109% of takt
  • Assembly & pack66.3 s · 74% of takt

The black line is takt. Welding is over takt once stoppages and rework are counted — that's where the line can't keep up.

Next: map the whole value stream

Open these numbers in the free Value Stream Builder. It draws the current-state map, adds the stock between processes as days of demand, and guides you to a future state. No sign-up; it all stays in your browser.

The takt time formula

Takt time = available time per day ÷ customer demand per day

Available time is planned working time less planned breaks — not machine capacity, and not overtime. Two 8-hour shifts with 30 minutes of breaks each give 2 × (28 800 − 1 800) = 54 000 seconds a day.

Daily demand is the customer's demand for the product family divided by the working days in the same period. 12 000 parts a month, at 5 days a week and 48 working weeks a year, is 12 000 ÷ 20 = 600 parts a day.

So takt is 54 000 ÷ 600 = 90 seconds: the customer takes one part every 90 seconds, and every process in the value stream has to keep up with that over the day.

Checking a process against takt

A stopwatch cycle time under takt doesn't mean a process can keep up. Stoppages and rework eat into it. Compare the effective cycle time instead: cycle time ÷ uptime ÷ first-pass yield. A welding cell with an 80-second cycle, 85 % uptime and 96 % first-pass yield is effectively 80 ÷ 0.85 ÷ 0.96 ≈ 98 seconds — over a 90-second takt, although the stopwatch said it had 10 seconds to spare.

Over takt means the line can't keep up without overtime or extra stock. Close to takt (above about 90 %) means any wobble will show. Both become improvement targets — uptime, yield, changeovers or the work content — when you design the future state.

From takt to a value stream map

Takt is the first of the future-state questions in value stream mapping, and every later decision — where work can flow, where pull replaces the schedule, which process sets the pace — is judged against it. The free Value Stream Builder takes the same numbers, draws the current-state map with the standard symbols, turns stock into days of demand and guides you through the rest. The VSM symbols cheat sheet and the worked value stream map examples show what the finished maps look like.

Questions

What is takt time?

Takt time is the rate at which the customer buys: the available working time divided by customer demand for the same period. If a line works 54 000 seconds a day and the customer needs 600 parts a day, takt is 90 seconds — one part every 90 seconds.

How do you calculate takt time?

Takt time = available time per day ÷ customer demand per day. Available time is planned working time less planned breaks: shifts × (hours per shift × 3 600 − break minutes × 60). Daily demand is the period's demand divided by the working days in that period.

What's the difference between takt time and cycle time?

Takt time comes from the customer: how often they need a part. Cycle time comes from the process: how often a part actually comes off it, timed with a stopwatch. A process can keep up when its effective cycle time — cycle time ÷ uptime ÷ first-pass yield — is under takt.

What's the difference between takt time and lead time?

Takt time is a rate (seconds per part). Lead time is a duration: how long one part takes to get through the whole value stream, mostly waiting in stock. A value stream map shows both — and usually that the lead time is days or weeks while the processing time is minutes.

Should overtime count as available time?

No. Calculate takt on planned time. Overtime that's needed every week is a sign that a process can't keep up with takt — a problem to solve, not time to plan with.

What is pitch?

Pitch is takt time multiplied by the pack-out quantity: the time it takes to make one container. At a 90-second takt and 20 parts to a box, pitch is 30 minutes. In a lean value stream, work is released to the pacemaker one pitch at a time.

Certification & implementation

Working on a certification or system implementation project?

Implementing ISO 9001, moving to the 2026 edition, getting ready for a certification audit, or stuck on a clause that doesn't seem to fit your operation? Tell us where you are and where you're stuck. We'll look at it and suggest a practical next step, or connect you with people we trust who can help.

Email hello@qlause.app

No sales pitch, no obligation — we read every message.