ConfirmedISO 9001:2026 publishes 16 September 2026. FDIS approved 7 August 2026.What it means →
← Back to Clause Explorer
2.5.10FSSC 22000:V7

Transport, storage and warehousing — stock rotation and tankers

Plain-language summary

FEFO as well as FIFO stock rotation, post-slaughter time and temperature limits for C0, and risk-based cleaning controls for bulk tankers.

What the clause is really asking

Storage is where good product quietly goes bad. You need a stock management procedure with a specified rotation system that applies first-expired-first-out principles together with first-in-first-out. Slaughter operations (C0) must define post-slaughter time and temperature requirements for chilling or freezing. Where tankers are used, organisations dispatching final product in tankers need a documented, risk-based tanker cleaning plan covering cross-contamination sources, control measures and cleaning validation, plus a cleanliness check of the empty tanker before loading; organisations receiving raw material by tanker must have supplier agreements covering cleaning validation, prior-use restrictions and the relevant controls.

What auditors look for

Auditors pick a pallet and check both dates — receipt and expiry — against what left first. On tanker sites they ask for the cleaning validation, the pre-load inspection record and the supplier agreement's prior-load clause.

Typical evidence

Stock rotation procedure (FEFO + FIFO) and warehouse records; post-slaughter time/temperature specifications and records (C0); tanker cleaning plan with validation; pre-load cleanliness inspection records; supplier agreements covering tanker cleaning and prior use

How to comply — recommendations

Make the warehouse system enforce FEFO — expiry-date picking, not just receipt order — and spot-check it. For tankers, write the prior-load restriction into the supplier agreement and refuse loads that cannot show it; validate cleaning once and verify at every reception.

Common nonconformities

FIFO only, with short-dated stock left behind; no post-slaughter limits (C0); tanker cleaning assumed, not validated; supplier agreements silent on prior loads

Related clauses

ISO 22000 8.2.4 (PRP considerations), 8.4 (emergency preparedness); ISO 22002-100:2025 clause 11.1 (transport and storage); ISO 22002-5:2025

Get the free ISO 9001:2026 Readiness Scorecard

Free, instant download. We'll only email you the occasional practical quality update — no spam, unsubscribe anytime.

Qlause provides interpretive guidance only and is not a substitute for the standard. Refer to your licensed copy of the relevant standard for the authoritative text.